Skins

dhtmlxGantt provides several predefined skins that you can use to change the overall look of the Gantt chart:

  1. Terrace (default)
  2. Dark
  3. Material
  4. Contrast Black
  5. Contrast White
  6. Skyblue
  7. Meadow
  8. Broadway

Starting from v9.0, all skins are bundled in the main dhtmlxgantt.css file. A skin can be activated by setting the gantt.skin property:

gantt.skin = "dark";

Or by calling the gantt.setSkin() method:

gantt.setSkin("dark");

In Gantt v8.0 and earlier skins are defined in separate CSS files.

Using fonts​

By default, skins import the Inter font from https://fonts.googleapis.com. Read more about Google Fonts here.

@import (css) url(
'https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=swap'
);

If necessary, you can remove the font directly from .less files in the codebase/sources/less/ folder and then rebuild the skin as described in the Skins Customization article.

'Terrace' skin​

To apply the default skin, include the default CSS file:

  • dhtmlxgantt.css

gantt-default-skin

Default skin

Use accessibility.increase_contrast to increase text contrast while keeping the Terrace skin.

'Dark' skin​

To apply the 'Dark' skin, include the default CSS file:

  • dhtmlxgantt.css

And set the skin via the gantt.skin property:

gantt.skin = "dark";

gantt_dark_skin

The Accessibility Conformance Report includes the dark skin in its evaluation of minimum text contrast.

Dark skin

'Material' skin​

To apply the 'Material' skin, include the default CSS file:

  • dhtmlxgantt.css

And set the skin via the gantt.skin property:

gantt.skin = "material";

gantt_material_skin

Material theme

Starting from v6.3, the import of Roboto font was removed from the Material skin. If necessary, you can add Roboto font manually, as in:

<link rel="stylesheet" href="'https://fonts.googleapis.com/css?'+
+'family="Open+Sans|Roboto:regular,medium,thin,bold"'">

'Contrast Black' skin​

To apply the 'Contrast Black' skin, include the default CSS file:

  • dhtmlxgantt.css

And set the skin via the gantt.skin property:

gantt.skin = "contrast-black";

gantt_contrast_black_skin

High contrast theme - Black

'Contrast White' skin​

To apply the 'Contrast White' skin, include the default CSS file:

  • dhtmlxgantt.css

And set the skin via the gantt.skin property:

gantt.skin = "contrast-white";

gantt_contrast_white_skin

High contrast theme - White

'Skyblue' skin​

To apply the 'Skyblue' skin, include the default CSS file:

  • dhtmlxgantt.css

And set the skin via the gantt.skin property:

gantt.skin = "skyblue";

gantt-skyblue-skin

'Skyblue' skin

'Meadow' skin​

To apply the 'Meadow' skin, include the default CSS file:

  • dhtmlxgantt.css

And set the skin via the gantt.skin property:

gantt.skin = "meadow";

gantt-meadow-skin

'Meadow' skin

'Broadway' skin​

To apply the 'Broadway' skin, include the default CSS file:

  • dhtmlxgantt.css

And set the skin via the gantt.skin property:

gantt.skin = "broadway";

gantt-broadway-skin

'Broadway' skin